The NYC TR2 form plays a crucial role in the construction process, particularly when it comes to ensuring the integrity and safety of concrete used in building projects. This technical report focuses on concrete sampling and testing, requiring specific information to be provided for all applications. Essential details such as the location of the project, including house numbers, street names, and boroughs, must be meticulously filled out. Additionally, the form requires information about the licensed concrete testing laboratory responsible for conducting the necessary tests. This includes the director's name, contact information, and their professional credentials. Signatures from key individuals, such as the design applicant and the building owner, are mandatory to confirm their acknowledgment and acceptance of the testing laboratory's responsibilities. The TR2 form also emphasizes the importance of compliance with New York City Construction Codes, highlighting the serious consequences of falsifying information. By following the guidelines outlined in this form, all parties involved can ensure that the concrete testing process is conducted properly, ultimately contributing to the safety and reliability of the structures being built.

Similar forms

  • NYC TR1 Form: Similar to the TR2, the TR1 form also requires information about concrete testing and the responsibilities of the testing laboratory. Both forms ensure compliance with New York City Construction Codes and require signatures from licensed professionals.
  • NYC TR3 Form: The TR3 form, like the TR2, is related to concrete testing but focuses on the design mix of concrete. It requires the producer's certification that the concrete meets specified design criteria, similar to the TR2's emphasis on testing compliance.
  • NYC TR4 Form: This form is used for special inspections and shares similarities with the TR2 in that it documents inspections and testing results. Both forms require signatures from licensed professionals to affirm the accuracy of the information provided.
  • NYC TR5 Form: The TR5 form pertains to concrete placement and curing. It parallels the TR2 in that both forms require detailed reporting on the concrete work and the responsibilities of the involved parties.
  • NYC TR6 Form: Similar to the TR2, the TR6 form is used for documenting the results of tests on concrete. Both forms require certification from licensed professionals and adherence to city regulations regarding concrete testing.
  • NYC TR7 Form: The TR7 form is utilized for reporting the results of concrete strength tests. It shares a common purpose with the TR2 in ensuring that concrete testing is properly documented and compliant with city codes.
  • NYC TR8 Form: This form is for documenting the results of field tests on concrete. Like the TR2, it emphasizes the importance of accurate reporting and requires signatures from licensed professionals to verify compliance.
  • NYC TR9 Form: The TR9 form is used for concrete inspection reports. It is similar to the TR2 in that both require detailed information about the testing and inspection process to ensure adherence to construction codes.
  • NYC TR10 Form: The TR10 form focuses on the final inspection of concrete work. It parallels the TR2 by requiring confirmation of compliance with testing results and the responsibilities of the involved parties.

Form Preview

TR2: Technical Report

Concrete Sampling and Testing

Orient and affix BIS

job number label here

Must be typewritten.

Sheet number 1

1Location Information Required for ALL applications.

House No(s)

Street Name

 

 

 

 

 

 

 

 

Borough

Block

Lot

BIN

CB No.

 

 

 

 

 

Work on Floor(s)

 

 

 

Apt/Condo No(s)

 

 

 

 

 

2

Licensed Concrete Testing Lab Information Required for ALL applications.

 

 

 

 

 

 

 

 

 

Director Last Name

 

Director First Name

Director Middle Initial

 

 

 

 

 

 

 

 

 

Business Name

 

 

 

 

 

Business Telephone

 

 

 

 

 

 

 

 

 

Business Address

 

 

 

 

 

Business Fax

 

 

 

 

 

 

 

 

 

City

State

 

Zip

Mobile Telephone

 

 

 

 

 

 

 

 

 

E-Mail

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Director’s Lic. Number

 

 

P.E.

 

R.A.

Concrete Testing Lab Lic. Number

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

Licensed Concrete Testing Laboratory’s Identification of Responsibilities Required prior to Permit.

 

 

 

 

 

 

 

 

 

Check all that apply below:

 

 

 

 

 

 

I certify that I am the director of the licensed concrete testing laboratory accepting responsibility for conducting the testing in accordance with BC 1905.6 and BC 1704.1. I further certify that I have read the applicable sections of the New York City Construction Codes in connection with the testing of concrete and licensed concrete testing laboratories as well as 1 RCNY §5-02 and 1 RCNY §101-07(c)(6), which specifies the qualifications and duties required of a licensed concrete testing laboratory and that this licensed testing laboratory meets those qualifications for the work for which I take responsibility. I agree that both I and the licensed concrete testing laboratory will comply with all provisions of the New York City Construction Codes as well as 1 RCNY §5-02 and 1 RCNY §101-07(c)(6). I am aware of the additional sanctions imposed on false filings by §28-211.1.2 of the Administrative Code.

Change of Applicant: I am a newly designated individual responsible for the testing specified herein and I hereby state that: None of the tests indicated herein have been performed to date by the previously designated individual.

Some of the tests indicated herein have been performed by the previously designated individual, as indicated in the attached report.

I am aware of the additional sanctions imposed on false filings by §28-211.1.2 of the Administrative Code.

Name (please print)

Signature

Date

P.E. / R.A. Seal (apply seal, then sign and date over seal)

10/09

TR2

Sheet number 2

 

 

 

 

 

 

 

4

Design Applicant’s Statement and Signature P.E./R.A. Required prior to Permit.

 

 

 

 

I certify that the licensed concrete testing laboratory specified in section 2 above and engaged by the owner to perform tests on the work at the location specified in section 1 above is acceptable. (BC 1704.1)

Name (please print)

Signature

Date

 

 

P.E. / R.A. Seal (apply seal, then sign and date over seal)

5Building Owner’s Statement and Signature Required prior to Permit.

I certify that I have employed the licensed concrete testing laboratory specified in section 2 above in accordance with BC 1704.1. Falsification of any statement is a misdemeanor and is punishable by a fine or imprisonment, or both. It is unlawful to give to a city employee, or for a city employee to accept, any benefit, monetary or otherwise, either as a gratuity for properly performing the job or in exchange for special consideration. Violation is punishable by a fine or imprisonment, or both. I understand that if I am found after hearing to have knowingly or negligently made a false statement or to have knowingly or negligently falsified or allowed to be falsified any certificate, form, signed statement, application, report or certification of the correction of a violation required under the provisions of this code or of a rule of any agency, I may be barred from filing further applications or documents with the Department.

Name (print)

Title

 

 

Signature

Date

 

 

STOP HERE PRIOR TO PERMIT

10/09

TR2

Sheet number

of

sheets

 

 

 

 

 

 

 

6Test Report Required prior to Sign-off. Use supplemental pages as needed. Attach Original Lab Test Reports

Specified Concrete Str. (f’c):

 

PSI

 

 

Specified Test Age (days):

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Field Testing Results:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Test Report

Date of

Cylinder I.D.

Slump

Air Content

Temperature

Weight

 

Placement

Total

Breaking

Number

Placement

 

 

 

 

 

 

Location

Placement

Strength

 

 

 

 

 

 

 

 

 

 

 

 

 

 

in

%

°F

 

lbs/ft3

 

yd3

PSI

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Licensed Concrete Lab Director Name (please print)

Signature

Date

 

 

P.E. / R.A. Seal (apply seal, then sign and date over seal)

10/09

TR2

Sheet number of sheets

7 Licensed Concrete Testing Laboratory’s Certification of Completion Required prior to Sign-off.

I certify that I have completed the testing specified herein and that the results reported in section 6 of this form are true and accurate in accordance with §28-406.3.2.

I am aware of the additional sanctions imposed on false filings by §28-211.1.2 of the Administrative Code.

Withdrawal of Applicant: I am withdrawing responsibility for conducting the tests indicated herein and herewith submit the results or status of the work performed to date.

Name (please print)

Signature

Date

 

 

P.E. / R.A. Seal (apply seal, then sign and date over seal)

8 Design Applicant’s Statements and Signatures Required prior to Sign-off. P.E./R.A. responsible for plans, choose one and sign/seal.

I certify I have reviewed the test results reported by the licensed concrete testing lab in section 6 above and found them to be in compli- ance with the approved construction documents.

I certify I have reviewed the test results reported by the licensed concrete testing lab in section 6 above and found them to be in compli- ance with the approved construction documents except as noted in the attached report (BC 1905.6.3.3)

Note: design applicant’s signed and sealed report must be attached to this document

Name (please print)

Signature

Date

 

 

P.E. / R.A. Seal (apply seal, then sign and date over seal)

9Concrete Producer’s Statement and Signature Required prior to Sign-off. Must be filled out by Owner of Production Facility.

I certify that the test results reported in section 6 above were reported to me, and I further certify that the concrete delivered is in accordance with the design mix(es) specified on the TR3 submitted for the work specified in section 1 above.

 

Name (print)

 

Title

 

 

 

 

 

Signature

Date

NRMCA Expiration Date (BC 1905.8.2)

 

 

 

 

 

Business Name

 

Business Telephone

 

 

 

 

 

Business Address

 

Business Fax:

 

 

 

 

 

City

State

Zip

 

 

 

 

 

 

 

 

10/09

Common mistakes

Filling out the NYC TR2 form can be straightforward, but many people make common mistakes that can lead to delays or complications. One significant error is failing to provide accurate location information. Ensure that all fields, such as house number, street name, and borough, are completed correctly. Missing or incorrect details can cause processing issues.

Another frequent mistake involves not including the correct licensed concrete testing lab information. It’s crucial to verify that the director’s name, business name, and contact details are accurate. Any discrepancies here can raise red flags and may require additional verification.

People often overlook the certification section, where the lab director must affirm their responsibilities. Not checking all applicable boxes can lead to confusion about who is accountable for the testing. Take the time to read this section carefully and ensure all necessary boxes are checked.

Inaccurate signatures are also a common issue. Each signature must match the name printed on the form. If a signature does not match, it could lead to questions about the validity of the document. Make sure to double-check that all signatures are clear and correct.

Many individuals forget to include the P.E. or R.A. seal where required. This seal is not just a formality; it signifies that a licensed professional has reviewed the document. Omitting this step can halt the approval process.

People sometimes neglect to attach the original lab test reports. These reports are critical for verifying the concrete tests conducted. Without them, the application may be considered incomplete, leading to delays.

Another mistake is failing to sign and date the form properly. Each section requiring a signature must be completed accurately. Missing dates can create confusion about when the tests were conducted and the form was submitted.

Lastly, applicants often underestimate the importance of reading the entire form carefully. Skipping sections or glossing over instructions can result in significant oversights. Take the time to review each part of the form to ensure completeness and accuracy.

More About Nyc Tr2

  1. What is the NYC TR2 form?

    The NYC TR2 form is a Technical Report used for concrete sampling and testing. It is required for construction projects in New York City to ensure that concrete testing is conducted in compliance with the city’s construction codes. This form must be completed by a licensed concrete testing laboratory and includes various sections that capture essential information about the testing process and results.

  2. Who needs to fill out the NYC TR2 form?

    The form must be filled out by the director of a licensed concrete testing laboratory, the design applicant (a licensed professional engineer or registered architect), and the building owner. Each of these parties has specific responsibilities and certifications that must be documented on the form prior to obtaining a construction permit.

  3. What information is required in Section 1 of the form?

    Section 1 requires detailed location information for the construction project. This includes the house number(s), street name, borough, block, lot, building identification number (BIN), community board number (CB No.), and the specific floor and apartment or condo number where the work will take place. Accurate information is crucial for the processing of the application.

  4. What responsibilities does the licensed concrete testing laboratory have?

    The licensed concrete testing laboratory must certify that it will conduct testing in accordance with the New York City Building Code. This includes understanding the applicable construction codes and ensuring that the laboratory meets all qualifications. The laboratory director must also acknowledge the consequences of providing false information, as it can lead to sanctions.

  5. What is the purpose of the Building Owner’s Statement?

    The Building Owner’s Statement serves to confirm that the owner has engaged the specified licensed concrete testing laboratory for the project. This statement emphasizes the importance of accurate reporting and outlines the potential legal consequences for falsifying any information related to the testing process.

  6. How is the test report section structured?

    The test report section requires detailed results from the concrete tests conducted. This includes information such as the specified concrete strength, test age, and various field testing results. The laboratory must attach original lab test reports to this section to provide verification of the findings. The results must be signed and sealed by the licensed concrete lab director.

  7. What happens if false information is provided on the NYC TR2 form?

    Providing false information on the NYC TR2 form can lead to serious consequences. Individuals may face fines, imprisonment, or both. Additionally, if found guilty of making false statements, they may be barred from filing future applications or documents with the Department of Buildings. It is essential to ensure all information is accurate and truthful.

Misconceptions

Misconceptions about the NYC TR2 form can lead to confusion and potential compliance issues. Here are four common misunderstandings:

  • All sections are optional. Some people believe that they can skip sections of the TR2 form if they feel they are not relevant. In reality, all sections are required to ensure comprehensive documentation and compliance with city regulations.
  • Only licensed engineers need to sign the form. While it is true that licensed professionals, such as P.E.s and R.A.s, must sign the form, the building owner and concrete testing lab director also have important responsibilities and must provide their signatures to validate the process.
  • Submitting the form is the final step. Many assume that once the TR2 form is submitted, the process is complete. However, it is crucial to understand that this form is part of a larger permitting process, and additional approvals or documentation may be required before work can commence.
  • All test results are automatically accepted. Some believe that once the concrete testing laboratory submits results, they are automatically deemed acceptable. In fact, the results must be reviewed and certified by the design applicant to ensure compliance with the approved construction documents.

Key takeaways

When filling out and using the NYC TR2 form, keep these key takeaways in mind:

  • Typewritten Completion: Ensure that the entire form is filled out using a typewriter or a computer. Handwritten entries may lead to processing delays.
  • Accurate Information: Provide precise details in all sections, including location, laboratory information, and signatures. Inaccuracies can result in penalties or delays.
  • Required Signatures: Obtain all necessary signatures from the concrete testing lab director, design applicant, and building owner before submitting the form. Missing signatures can halt the permit process.
  • Compliance Awareness: Understand that false statements can lead to serious consequences, including fines and potential barring from future applications. Review all relevant codes and regulations.

Nyc Tr2: Usage Guide

Completing the NYC TR2 form is an essential step in ensuring compliance with local construction regulations. This form requires specific information about the concrete testing laboratory, the individuals responsible for the testing, and the results of the tests conducted. Follow these steps carefully to fill out the form accurately.

  1. Prepare your materials: Gather all necessary information, including the job number label, details about the location, and contact information for the concrete testing lab.
  2. Fill in location information: On the first section of the form, provide the house number(s), street name, borough, block, lot, BIN, CB number, work on floor(s), and any applicable apartment or condo numbers.
  3. Enter lab information: Complete the section for the licensed concrete testing laboratory. Include the director’s last name, first name, middle initial, business name, telephone number, address, fax number, city, state, zip code, mobile telephone, email, director’s license number, and lab license number.
  4. Identify responsibilities: Check all applicable boxes to certify your responsibilities regarding the testing and compliance with construction codes. Include your name, signature, and the date. If applicable, indicate if there has been a change of applicant.
  5. Design applicant's statement: The design applicant must sign and date the statement certifying that the testing laboratory is acceptable.
  6. Building owner's statement: The building owner should certify the employment of the testing laboratory and sign and date this section.
  7. Complete the test report: Fill out the test report section, providing details on the specified concrete strength, test age, and field testing results. Include the licensed concrete lab director’s name, signature, and date.
  8. Certification of completion: The licensed concrete testing laboratory must certify the completion of testing and the accuracy of the results. Include the name, signature, and date of the responsible individual.
  9. Design applicant's final review: The design applicant must review the test results, sign, and apply their seal to indicate compliance with approved documents.
  10. Concrete producer's statement: The owner of the production facility must certify that the concrete delivered meets the specified design mix and sign the statement.

Once the form is completed, review it for accuracy before submitting it to the appropriate department. Ensure that all signatures and seals are in place, as missing information could delay the permit process. Following these steps will help facilitate a smoother experience in your construction project.