The NYC PW5 form serves as a crucial tool for managing after-hours work permits within the bustling environment of New York City. This application is designed to ensure that construction and renovation activities occurring outside regular hours adhere to local regulations, minimizing disturbances to residents and maintaining public safety. To initiate the process, applicants must provide comprehensive information, including the job's location, contractor details, and the nature of the work being performed. A critical aspect of this form is the requirement to specify whether a residence is located within 200 feet of the work site, as this can significantly impact the approval of variance requests. It is essential to note that all submissions must be complete; any missing information will result in automatic denial without review. The application also includes a section for variance requests, which must be submitted by the designated deadline to ensure timely processing. Furthermore, applicants must acknowledge the importance of compliance with noise mitigation regulations, reinforcing the city's commitment to preserving the quality of life for its residents. By understanding the nuances of the PW5 form, applicants can navigate the permitting process more effectively, contributing to a smoother construction experience while respecting the needs of the community.

Similar forms

The NYC PW5 form, which is an After Hours Work Permit Application, shares similarities with several other documents used in various regulatory and permit processes. Here is a list of nine documents that are comparable to the PW5 form, along with an explanation of how they are similar:

  • Building Permit Application: Like the PW5 form, this document requires detailed information about the work being done, including the location, type of work, and contractor details. Both forms ensure compliance with city regulations before work can begin.
  • Electrical Permit Application: This form is specifically for electrical work, much like the PW5 is for after-hours projects. Both require information about the contractor and the nature of the work, ensuring safety and adherence to codes.
  • Variance Application: Similar to the variance section in the PW5, this document requests permission to deviate from zoning laws. Both require justification for the request and details about the impact on the surrounding area.
  • Noise Mitigation Plan: The PW5 form mandates the submission of a noise mitigation plan. Similarly, this document outlines strategies to minimize noise during construction, ensuring compliance with local noise regulations.
  • Site Safety Plan: This document outlines safety measures for construction sites, akin to the safety considerations required in the PW5. Both emphasize the importance of protecting workers and the public during construction activities.
  • Temporary Occupancy Permit: This permit allows for temporary use of a building or structure. Like the PW5, it requires specific details about the work and its impact on the community, ensuring that all safety measures are in place.
  • Construction Management Plan: Similar to the requirements of the PW5 form, this document details how a construction project will be managed to minimize disruption. Both emphasize planning and communication with local authorities.
  • Demolition Permit Application: This form is necessary for any demolition work, paralleling the PW5's requirement for after-hours work. Both require detailed information about the work, contractor, and safety measures.
  • Land Use Application: This document is used to request changes in land use, much like the variance requests in the PW5. Both require justification for the changes and an assessment of their impact on the community.

Understanding the similarities between these documents can help streamline the application process and ensure compliance with city regulations.

Form Preview

PW5: After Hours

Work Permit Application

Orient and affix BIS

job number label here

Must be typewritten

All information must be completed for review of this request. Incomplete submissions will be denied without review.

The deadline to submit weekend variance requests is Tuesday at 3:00PM, and variances will not be granted for any day earlier than Saturday of the same week.

1Filing Status Information Required for all applications. Check applicable box for application type.

Work Permit No.

 

 

 

BIS Job

 

Electrical Application

Variance Type:

 

Initial

 

Renewal

2Location Information Required for all applications.

House No(s)

Street Name

 

 

 

 

 

 

 

 

Borough

Block

Lot

BIN

CB No.

 

 

 

 

 

Work on Floor(s)

 

 

 

Apt/Condo No(s)

 

 

 

 

 

3

Contractor Required for all applications. Business Fax and Email are optional.

Last Name

First Name

 

 

 

 

Middle Initial

 

 

 

 

 

 

 

 

 

 

 

 

 

Business Name

 

 

 

 

 

 

 

Business Telephone

 

 

 

 

 

 

 

 

 

 

 

 

 

Business Address

 

 

 

 

 

 

Business Fax / Email

 

 

 

 

 

 

 

 

 

 

 

 

 

City

State

Zip

 

 

 

Mobile Telephone

 

 

 

 

 

 

 

 

 

 

 

 

 

 

License Number

License Type

 

 

GC

 

Electrician

 

MP

 

FSC

 

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4Subcontractor If a subcontractor is involved in this work, their information must be provided. Business Fax and Email are optional.

Last Name

 

First Name

Middle Initial

 

 

 

 

Business Name

 

 

Business Telephone

 

 

 

 

Business Address

 

 

Business Fax / Email

 

 

 

 

City

State

Zip

Mobile Telephone

 

 

 

 

5

Variance Information Required for all applications.

Is a residence within 200 feet of the site?

 

Yes

 

No

Total Number of Days Requested:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Days of Week

Date(s) Requested

 

 

Hours

Description of Work (Specify weekday vs. weekend work)

 

Monday

 

 

 

 

 

to

 

 

 

 

 

 

 

 

 

 

 

Tuesday

 

 

 

 

 

to

 

Weekday

 

 

 

 

 

 

 

 

Wednesday

 

 

 

 

 

to

 

 

 

 

 

 

 

 

 

 

 

Thursday

 

 

 

 

 

to

 

 

 

 

 

 

 

 

 

 

 

Friday

 

 

 

 

 

to

 

 

 

 

 

 

 

 

 

 

Weekend

Saturday

 

 

 

 

 

to

 

 

 

 

 

 

 

 

 

Sunday

 

 

 

 

 

to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Reason for Variance:

6Statements and Signature Required for all applications.

This permit must be posted visible to the public. Falsification of any statement is a misdemeanor and is punishable by a fine or imprisonment, or both. It is unlawful to give to a city employee, or for a city employee to accept, any benefit, monetary or otherwise, either as a gratuity for properly performing the job or in exchange for special consideration. Violation is punishable by imprisonment or fine or both.

I understand that if I am found after hearing to have knowingly or negligently made a false statement or to have knowingly or negligently falsified or allowed to be falsified any certificate, form, signed statement, application, report or certification of the correction of a violation required under the provisions of this code or of a rule of any agency, I may be barred from filing further applications or documents with the Department.

I hereby certify that I have developed a noise mitigation plan for the site in accordance with Administrative Code § 24-219 through § 24-224 and that such plan is in compliance with the Department of Environmental Protection’s noise mitigation rules.

Contractor Name (print)

Signature

Date

 

 

Internal Use Only

Approved

Denied

Limited Approval

Indicate days-of-week authorized for electronic renewal

Limited to:

Borough Commissioner Signature

Date

 

Filing Fee

Permit Fee

 

 

 

 

 

 

 

 

 

12/10

Common mistakes

Completing the NYC PW5 form accurately is essential for obtaining an After Hours Work Permit. Many individuals make common mistakes that can lead to delays or denials of their applications. Awareness of these errors can significantly improve the submission process.

One frequent mistake is failing to complete all required fields. The form explicitly states that all information must be filled out for the application to be reviewed. Incomplete submissions will be denied without review. It is crucial to double-check that every section is filled out correctly before submission.

Another common error involves incorrect filing status information. Applicants often neglect to check the appropriate box for the application type, whether it is an initial or renewal request. This oversight can lead to confusion and unnecessary delays in processing the application.

Location information is also critical. Applicants sometimes forget to provide complete details, such as the house number, street name, borough, block, and lot. Missing this information can result in the application being returned for correction, which can extend the waiting period.

Contractor information must be accurate as well. Applicants occasionally provide incomplete details about the contractor, such as omitting the business name or license number. This can hinder the verification process and delay the issuance of the permit.

When subcontractors are involved, their information must also be included. Some applicants overlook this requirement, which can lead to complications. Providing complete details about subcontractors ensures compliance with city regulations.

Another mistake is related to the variance information section. Applicants sometimes do not specify whether a residence is within 200 feet of the site, or they fail to provide the total number of days requested. Omitting these details can result in a denial of the variance request.

Additionally, applicants may not clearly describe the work being performed. It is essential to specify the nature of the work and differentiate between weekday and weekend tasks. Vague descriptions can lead to misunderstandings and potential rejections.

Lastly, signatures and statements are often improperly handled. Applicants must ensure they sign and date the form. Furthermore, failing to acknowledge the legal implications of falsifying information can have serious consequences, including fines or imprisonment. Understanding these responsibilities is vital for compliance.

By being aware of these common mistakes, individuals can improve their chances of a successful application for the NYC PW5 form. Attention to detail and thoroughness are key components in navigating the permitting process effectively.

More About Nyc Pw5

  1. What is the NYC PW5 form?

    The NYC PW5 form is an application for an After Hours Work Permit. This permit allows construction or other work to be conducted outside of regular hours, typically on weekends or evenings. The form must be completed in its entirety to be considered for approval.

  2. What information is required to complete the PW5 form?

    All sections of the PW5 form must be filled out, including:

    • Filing status information, including the type of application.
    • Location details, such as the house number, street name, borough, and block.
    • Contractor information, including name, contact details, and license number.
    • If applicable, subcontractor information must also be provided.
    • Variance information, including the reason for the request and the days and hours of work.

    Incomplete submissions will be denied without review.

  3. What is the deadline for submitting a weekend variance request?

    The deadline to submit requests for weekend variances is Tuesday at 3:00 PM. Variances will not be granted for any day earlier than Saturday of the same week.

  4. What happens if false information is provided on the PW5 form?

    Providing false information on the PW5 form is considered a misdemeanor. Individuals found to have knowingly falsified information may face fines or imprisonment. Additionally, they may be barred from filing future applications with the Department.

  5. What is required in terms of noise mitigation?

    Applicants must develop a noise mitigation plan in accordance with specific regulations. This plan must comply with the Department of Environmental Protection's noise mitigation rules and be included with the application.

  6. Where must the permit be displayed once approved?

    Once the PW5 permit is approved, it must be posted in a visible location to the public at the work site. This ensures that the permit is accessible for inspection by relevant authorities.

Misconceptions

Misconception 1: The PW5 form can be submitted incomplete.

Many believe that submitting an incomplete PW5 form will still allow for a review. This is incorrect. All information must be completed, or the submission will be denied without review.

Misconception 2: Variance requests can be submitted at any time.

Some think they can submit variance requests whenever they want. However, the deadline for weekend variance requests is Tuesday at 3:00 PM, and requests cannot be granted for any day earlier than the upcoming Saturday.

Misconception 3: The PW5 form does not require a contractor's information.

It is a common misunderstanding that contractor details are optional. In reality, the contractor's information is required for all applications submitted.

Misconception 4: A subcontractor's information is not necessary.

People often assume that if a subcontractor is involved, their information is not needed. This is false. The PW5 form mandates that subcontractor details be provided if applicable.

Misconception 5: The permit does not need to be posted publicly.

Some individuals think the permit can be kept private. This is incorrect; the permit must be posted in a visible location for the public to see.

Misconception 6: Falsifying information on the form has no serious consequences.

Many underestimate the seriousness of falsifying statements on the PW5 form. Such actions are misdemeanors and can lead to fines or imprisonment.

Misconception 7: A noise mitigation plan is optional.

Some believe that developing a noise mitigation plan is not necessary. In fact, it is a requirement that must comply with specific noise mitigation rules.

Misconception 8: The PW5 form can be submitted electronically without any limitations.

There is a misconception that electronic submissions are unrestricted. However, limited approvals may apply, and specific days of the week may be authorized for electronic renewal.

Key takeaways

When filling out and utilizing the NYC PW5 form for an After Hours Work Permit Application, consider the following key takeaways to ensure a smooth process:

  • Typewritten Submissions: All entries on the form must be typewritten. Handwritten submissions will not be accepted.
  • Complete Information: Every section of the form must be filled out completely. Incomplete applications will be denied without any review.
  • Submission Deadlines: For weekend variance requests, submissions must be made by Tuesday at 3:00 PM. Variances cannot be granted for any day earlier than the upcoming Saturday.
  • Filing Status: Indicate the type of application by checking the appropriate box. This includes options for initial or renewal work permits.
  • Accurate Location Details: Provide precise information regarding the location of the work, including house numbers, street names, boroughs, and block/lot numbers.
  • Contractor Information: All contractor details are required, including name, contact information, and license type. Optional fields include business fax and email.
  • Subcontractor Information: If a subcontractor is involved, their details must also be provided, ensuring all required fields are filled out.
  • Variance Information: Clearly state whether there is a residence within 200 feet of the work site and specify the total number of days requested for the variance.
  • Work Description: Describe the work to be performed, distinguishing between weekday and weekend tasks, along with the requested dates and hours.
  • Signature and Certification: The applicant must sign the form, certifying that they understand the legal implications of falsifying information and that a noise mitigation plan has been developed as required.

By adhering to these guidelines, applicants can avoid common pitfalls and enhance their chances of a successful application process.

Nyc Pw5: Usage Guide

Completing the NYC PW5 form requires careful attention to detail. Each section must be filled out accurately to ensure that the application is processed without delays. Incomplete forms will not be reviewed. After filling out the form, submit it by the specified deadline to avoid any issues.

  1. Begin by orienting the form and affixing the BIS job number label at the top.
  2. In the Filing Status Information section, check the appropriate box for the application type: Work Permit No., BIS Job, Electrical Application, or Variance Type (Initial or Renewal).
  3. Fill out the Location Information section with the following details:
    • House No(s)
    • Street Name
    • Borough
    • Block
    • Lot
    • BIN
    • CB No.
    • Work on Floor(s)
    • Apt/Condo No(s)
  4. Complete the Contractor section, including:
    • Last Name
    • First Name
    • Middle Initial
    • Business Name
    • Business Telephone
    • Business Address
    • Business Fax / Email (optional)
    • City
    • State
    • Zip
    • Mobile Telephone
    • License Number
    • License Type (GC, Electrician, MP, FSC, or Other)
  5. If applicable, provide the Subcontractor information in the same format as the Contractor section.
  6. In the Variance Information section, answer whether a residence is within 200 feet of the site (Yes or No). Then, provide:
    • Total Number of Days Requested
    • Days of Week
    • Date(s) Requested
    • Hours
    • Description of Work (indicate weekday vs. weekend work)
    • Reason for Variance
  7. Read the Statements and Signature section carefully. Print the Contractor Name, provide a signature, and include the date.