The NYC Buildings BO-9 form is an essential document for property owners and managers dealing with boiler inspections and renewals in New York City. This form serves two primary purposes: it allows individuals to file a Boiler Inspection Report with the Department of Buildings (DOB) and request a Boiler Renewal from the Department of Environmental Protection (DEP). To successfully complete the form, individuals must fill out specific sections based on their needs—sections 1 through 6 and 8 for the DOB report, and sections 1 through 3 and 7 through 8 for the DEP renewal request. Notably, this form is intended solely for the renewal of existing boilers; those looking to install new boilers must use different forms designated for that purpose. The BO-9 form requires detailed information, including the premises address, building occupancy type, and owner details, along with inspection results and fee calculations. Timely submission is crucial, as the form must be filed within 30 days of the inspection date to avoid penalties. Additionally, the accuracy of the information provided is paramount, as any falsification can lead to serious legal consequences. Accessible online, the form can be filled out legibly, either by hand or electronically, ensuring that property owners can meet their regulatory obligations efficiently.

Similar forms

The NYC Buildings BO 9 form is related to several other documents that serve similar purposes in the realm of boiler inspection and renewal. Below is a list of nine documents that are comparable to the BO 9 form, along with a brief explanation of how they are similar.

  • DEP Form APC 5-0: This form is used for new boiler installations exceeding 2.8 million BTUs. Like the BO 9, it requires detailed information about the boiler and its operation.
  • DEP Form APC 501: Similar to the APC 5-0, this form is for new boiler installations but for those under 2.8 million BTUs. Both forms necessitate a thorough inspection process.
  • DOB Form 900A: This form is required for new boiler installations and involves similar information regarding compliance with safety regulations, akin to the BO 9 form.
  • DOB Form PW-1: Used for plumbing work permits, this form requires information about the installation and inspection of plumbing systems, paralleling the boiler inspection details in the BO 9.
  • DOB Form PW-1C: This form is related to plumbing work and inspections. It shares the need for detailed reporting and compliance checks, similar to the BO 9 form.
  • DOB Inspection Report: This document records the findings of an inspection, much like the inspection section of the BO 9, which details the results of boiler inspections.
  • NYC Department of Environmental Protection Registration Form: This form is used for registering boilers with the DEP. It shares the goal of ensuring compliance with environmental regulations, similar to the BO 9.
  • Boiler Insurance Certificate: This document certifies that a boiler is insured and has passed inspection, paralleling the insurance information required in the BO 9 form.
  • NYC Boiler Operator License Application: This application is necessary for individuals who operate boilers. It requires information about the operator’s qualifications, similar to the authorized inspector details in the BO 9.

Form Preview

BO9: DOB Boiler Inspection Report

Note: This inspection report must be filed within forty-five (45) days following the inspection date. Only one form per boiler. Filing Fee Payment Required: Refer to Agency Fee Rule

1

Property Information (Address where the Boiler is Physically Located)

 

Borough:

Block:

Lot:

BIN:

Special Place Name:

 

 

 

 

 

 

House No.:

Street Name:

 

Zip:

 

 

 

 

 

 

 

Multiple Dwelling

Commercial

Mixed Use

Other:

Total Number of Residential Units:

 

 

 

 

 

If Fee Exempt, check type of acceptable proof:

Real Estate $0.00 tax bill

Verification Letter from Department of Finance

 

 

 

 

2

Owner/Representative Information (for returned purposes)

 

 

 

 

 

 

 

 

 

Owner/Contact Name:

 

 

Day Phone:

Email:

 

 

 

 

 

 

 

Address:

City:

 

State:

Zip:

3

Authorized Inspector Information

License Professional First / Last Name

 

License Number:

 

 

 

 

 

 

License Type:

Oil Burner Installer

Master Plumber

High Pressure Boiler Operator

Insurance Company

 

 

 

 

 

 

Company Name:

 

Business Telephone:

Email:

 

 

 

 

 

 

 

 

Company Address:

 

City:

State:

Zip:

 

4

Boiler Device Information

Inspection Completed On:

Boilers must be inspected in accordance with requirements of NY State Labor Law Sections 204, NY State Department of Labor Rules and Regulations 12 NYCRR 4, New York City Code, Article 303 of Title 28 of the Administrative Code, and RCNY §§ 101-07 and 103

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspection

 

DOB Boiler Number

 

 

 

 

 

 

 

 

Pressure

 

 

 

 

 

 

 

 

 

I = Internal

##### - ##

 

Boiler Make & Model

Hi/Lo

PSI

 

 

BTUs

Location/Floor

 

E=External

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

Boiler Inspection Defect Summary

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspection Results:

No Hazardous Defects, if there are Recommendations for Non-hazardous conditions to be corrected, indicate below

 

 

(or)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(check one only)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes - Hazardous Defects Found (BO13 must be filed within 180 days of insp. date), must indicate defects below

 

 

 

Defect (s) Summary

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BOILER PART

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VIOLATING CONDITION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REMEDY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Comments/Notes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

Authorized Inspector’s Statements and Signature

SEAL

(to be sealed by Oil Burner Installer or Master Plumber only)

Licensee Name:

License No.:

The Department of Buildings’ Boiler Division must receive this form within 45 days of the in- spection date. If the report is not filed prior to deadline, the owner shall be liable for a civil penalty, pursuant to Section 103-01(c) of Subchapter C of Chapter 100 of Title 1 of the Official Compilation of the Rules of the City of New York.

I hereby state that the information above is correct and complete to the best of my knowledge. Falsification of any statement is a misdemeanor under §§28-211.1, 28-201.2.1.2, and 28-

203.1.1of the Administrative Code and is punishable by a fine, imprisonment, or both. It is a crime to offer or give to a city employee, or for a city employee to accept, any benefit, mone- tary or otherwise, either as a gratuity for properly performing the job or in exchange for special consideration. A conviction of offering of a bribe or gratuity is punishable by imprisonment, fine or both.

Licensee Signature:

Date:

INTERNAL USE ONLY—DO NOT WRITE

DOB Audit—Inspector’s Initials:

Badge Number:

Violation Issued

No Violation Found

 

 

Inspection Date:

Comments:

BO9 (5/14)

Common mistakes

Filling out the NYC Buildings BO-9 form can be a straightforward process, but there are common mistakes that individuals often make. One frequent error occurs in the premises address section. It is essential to ensure that the address is complete and accurate. Omitting details such as the ZIP code or using incorrect block and lot numbers can lead to delays in processing. If the address does not match city records, it may cause complications with inspections or renewals.

Another mistake involves incomplete owner information. When providing details about the owner or the contact person, it is crucial to fill in all required fields. Missing information, such as the business phone number or email, can hinder communication between the city and the property owner. Additionally, if there has been a change in ownership since the last filing, this must be clearly indicated. Failing to do so can result in the form being rejected.

In the section concerning the boiler inspection report, people often forget to check the type of inspection completed. Indicating whether the inspection was internal or external is vital for proper record-keeping. Furthermore, if the inspection was fee-exempt, the appropriate proof must be provided. Neglecting to include this information can lead to unnecessary fines or penalties.

Lastly, many individuals overlook the fee calculation section. It is important to accurately calculate and enter the total fees for both the DOB and DEP. Leaving these fields blank or entering incorrect amounts can cause significant delays in processing. Ensure that the grand total is clearly stated and that a check or money order is made out to the correct agency. By taking the time to double-check these sections, individuals can avoid common pitfalls and ensure a smoother filing experience.

More About Nyc Buildings Bo 9

  1. What is the NYC Buildings BO-9 form?

    The NYC Buildings BO-9 form is used for the DOB Boiler Inspection Report and the DEP Boiler Renewal Request. It is essential for renewing existing boiler registrations and ensuring compliance with city regulations.

  2. Who needs to complete the BO-9 form?

    Owners of existing boilers must complete the BO-9 form. This includes those who need to renew their boiler registration or request an inspection. If there has been a change in ownership since the last filing, the new owner must also complete the necessary sections.

  3. How do I fill out the BO-9 form?

    To complete the form, you must fill out sections 1-6 and 8 for the DOB Boiler Inspection Report. For the DEP Boiler Renewal Request, complete sections 1-3 and 7-8. It is also possible to fulfill the filing requirements for both agencies by completing the entire form.

  4. What information is required in Section 1?

    Section 1 requires the premises address, including the borough, block, lot(s), BIN, house number, street name, and ZIP code. If applicable, you can also include a special place name.

  5. What are the fees associated with the BO-9 form?

    There are fees associated with the DOB inspection, which is $30 per boiler inspected. The total fee should be calculated and entered in Section 8, line a. For the DEP renewal, fees vary based on the number of identical units and must be entered in Section 8, line b.

  6. What happens if the BO-9 form is not filed on time?

    If the report is not filed by the owner prior to January 1st, the owner may be liable for a civil penalty. It is crucial to submit the form within 30 days of the inspection date to avoid penalties.

  7. What should I do if I have a new boiler installation?

    For new boiler installations, do not use the BO-9 form. Instead, file DEP Form APC 5-0 for boilers over 2.8mBTU or Form APC 501 for those under 2.8mBTU, along with DOB Form 900A, PW-1, and PW-1C.

  8. What is the consequence of falsifying information on the BO-9 form?

    Falsifying any statement on the BO-9 form is considered a misdemeanor and is punishable by a fine, imprisonment, or both. It is essential to provide accurate information to avoid legal consequences.

  9. Where do I submit the completed BO-9 form?

    The completed BO-9 form should be submitted to the Department of Buildings at 280 Broadway, 6th Floor, New York, New York 10007. Ensure that you make the check or money order payable to the NYC Department of Buildings for the total amount due.

Misconceptions

Misconceptions about the NYC Buildings BO-9 form can lead to confusion and potential penalties. Here are ten common misconceptions explained:

  1. Only new boiler installations require the BO-9 form. This form is specifically for the renewal of existing boilers. New installations require different forms.
  2. The BO-9 form can be submitted any time after the inspection. The form must be filed within 30 days of the inspection date to avoid penalties.
  3. All sections of the form are optional. Incomplete sections will result in the form being rejected. It is crucial to fill out all required parts.
  4. Only the owner can file the BO-9 form. An authorized agent can file on behalf of the owner, provided they have the necessary contact information.
  5. There are no fees associated with the BO-9 form. Fees apply for each boiler inspected, and these must be calculated and included when submitting the form.
  6. Filing with one agency is sufficient. Owners can fulfill requirements for both the DOB and DEP by completing the entire form, but must ensure all relevant sections are filled out.
  7. Insurance companies do not need to provide contact information. If an insurance company performs the inspection, their contact details must be included in the form.
  8. Boiler inspections can be conducted by anyone. Only authorized inspectors, such as licensed Master Plumbers or Oil Burner Equipment Installers, may conduct inspections.
  9. Submitting the form online is not allowed. The BO-9 form can be legibly printed, typewritten, or filled out online, making it accessible for various users.
  10. False statements on the form have no serious consequences. Falsification is a misdemeanor and can lead to fines or imprisonment, emphasizing the importance of accuracy.

Key takeaways

Filling out the NYC Buildings BO-9 form can seem daunting, but understanding the key points can simplify the process. Here are some essential takeaways:

  • Legibility is Crucial: Always fill out the form legibly. You can use printed, typewritten, or web-based fill-in forms. This ensures that your information is clear and easy to read.
  • Know What Sections to Complete: For the DOB Boiler Inspection Report, complete sections 1-6 and 8. For the DEP Boiler Renewal Request, fill out sections 1-3 and 7-8. Completing the entire form can fulfill requirements for both agencies.
  • Use for Renewals Only: This form is intended solely for the renewal of existing boilers. If you are installing a new boiler, different forms must be filed.
  • Timely Submission is Important: The form must be submitted to the Department of Buildings within 30 days of the inspection date. Late submissions can result in penalties.
  • Accurate Information is Key: Ensure that all information provided is accurate. Falsifying information can lead to serious legal consequences, including fines or imprisonment.
  • Fees Must be Calculated: Be sure to calculate and enter the correct fees in Section 8. This includes both DOB and DEP fees, which are necessary for processing your request.

By keeping these points in mind, you can navigate the BO-9 form with confidence and ensure that your submission meets all necessary requirements.

Nyc Buildings Bo 9: Usage Guide

Filling out the NYC Buildings BO-9 form is an essential step for managing boiler inspections and renewals. It’s important to ensure all information is accurate and complete to avoid any issues with your submission. Below are the steps to guide you through the process of filling out the form.

  1. Premises Address: Fill in the address of the property, including the borough, block, lot(s), Building Identification Number (BIN), house number, street name, and ZIP code. If applicable, include any special place name.
  2. Building Occupancy: Indicate the type of building occupancy by checking the appropriate box: Multiple Dwelling, Commercial, Mixed Use, or Other. Provide the total number of residential units.
  3. Owner Information: If there has been a change in ownership since the last filing, check the box. Fill in the owner’s name, business phone number, address, city, state, ZIP code, email, contact person, relationship to owner, and their business phone number and address.
  4. DOB Inspection Report: Enter the date of the inspection and select the type of inspection conducted (Internal or External). If the inspection is fee exempt, check the appropriate box for proof. List any pressure violations found, including the boiler make and model, floor number(s), and descriptions. Enter the number of boilers inspected and calculate the total fee.
  5. Boiler Insurance Company: Complete this section only if the insurance company performed the inspection. Provide the insurance company name, contact person, business phone number, address, and policy details.
  6. Authorized NYC Boiler Inspector: Include the name and license number of the inspector. Check the appropriate type of inspector and sign and date the form.
  7. Department of Environmental Protection: Complete this section only in the expiration year. Select whether you are renewing registration or certificate to operate. Provide installation numbers, expiration dates, number of identical units, and fees enclosed.
  8. Fee Calculation: Calculate and enter the DOB Total Fee and DEP Total Fee. Sum these amounts to find the Grand Total. Make sure not to leave any fields blank.

Once you have completed the form, double-check all entries for accuracy. It’s crucial to submit the form to the NYC Department of Buildings within 30 days of the inspection date to avoid penalties. Make your payment payable to NYC Department of Buildings and send it to the specified address.